日韩美女日日操天天爽,丁香色五月激情综合色丁香色五月 av人摸人人人澡人人超碰下载,神马光棍,热re99久

方案選型

伊努朱瓦克市政大樓

BlauAIR 07 CFH 6000-W

 

This area is characterised with a rather cold climate with summer temperature averaging 9-10 °C. The frost already sets in October and may last till May while temperatures may drop to  -50 °C.

The project required a ventilation unit capable of keeping the building warm and providing a reliable supply of fresh air.

This is exactly why the client chose BlauAIR 07 CFH 6000-W. This air handling unit has a bypass duct with an automatic actuator. When the automatic control system detects near-freezing conditions, the exhaust fan is automatically disabled while the supply fan continues to deliver warm indoor air to temper the heat exchanger core.

As soon as temperature balance is restored, the air handling unit reverts to normal operation. To ensure successful operation in challenging climatic conditions, the BlauAIR unit was fitted with heaters to prevent core freezing and provide additional supply air heating.

改善室內(nèi)環(huán)境,提高生活品質(zhì)
案例推薦
針對(duì)不同場(chǎng)景,提供高性能、低功耗的優(yōu)質(zhì)產(chǎn)品
湖北十堰火車站
武漢巴黎春天幼兒園
莉莉?qū)W生公寓
案例中心+